![]() |
L125: SR CAST CONCRETE 'SHORT' PLATFORM BRACKETS (12)
Pack of 12. When assembling SR concrete platforms you will need to use card or plasticard to make the floor and rear slabs. The separation on a typical real station platform is normally 4ft plus some room for grout each side although this can vary from location to location. The space between the pre-cast supports was usually infilled with a concrete panel or with brick. Grafitti is an optional, if sometime colourful, addition. (OO Gauge / 4mm Scale) Migrated from the MJT range. Formerly MJT 5002 Price: £3.50
|